Zenith CH750 Finishing: step-by-step builder's demonstration

Zenith CH750
Finishing

Publisher:
Copyright Date:
2010
Run Time:
150 min
Weight:
0.3lbs
PURCHASE OPTIONS
DVD
add to cart
$44.95

A step by step video guide for builders of the popular Zenith CH750 aircraft kit.

This DVD is a double disk volume in a series of videos covering the entire build process for the CH750 kit. Finishing is the final segment. This 2 DVD set shows the final assembly of the airframe including: mounting the horizontal tail, wings, and rigging the cables and controls of the aircraft. In addition, installation and routing of fuel lines and other plumbing details is shown. Except for engine and avionics, this video concludes the building process for the airframe. It is assumed the builder has completed the steps shown in the prior 750 building video series (Fuselage 1 and 2, Horizontal Tail, Wings, Slats & Flaps).

Note: This production does not replace or supersede the documentation provided with the kit. It is meant to be an aid in building the aircraft and its methods are presented only as a suggestion to builders.

This affordable 2 disk DVD video is approximately 2.5 hours in length and is divided into various video chapters to make navigation and review of desired sections fast and easy.

A snippet of the video:


TABLE OF CONTENTS:

Partial list of procedures demonstrated in this video are:

Rudder cable attachments
Rudder Hinge assembly
Mounting and aligning the stabilizer
Measuring range of elevator travel
Trimming elevator horn for proper travel
Rigging elevator cables
Assembling control horn
Mounting the wings
Rigging wing dihedral
Drilling struts for fitting
Strut length sizing and attachment
Strut fitting placement
Installing jury struts
Bubble door installation
Windshield installation
Installing the gascolator
Creating routes for fuel and brake lines
Routing of plumbing
Panel and top skin assembly

PRODUCT REVIEWS:

No rating yet... Be the first to rate this product!